![GB50548-2010330kV-750kV架空输电线路勘测规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/37/33689037/b_33689037.jpg)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
5 Survey at Preliminary Design Stage
5.1 General Provisions
5.1.1 The survey at preliminary design stage shall include data collection,field reconnaissance,participation in route selection,surveying of important crossing-over,crowded areas and relative location of danger effect on telecommunication lines,aerial photographing,control survey on photographs,photograph annotation,aerial triangulation,surveying of skeletonized plans and sections,route optimization with threedimensional digital model,and so forth.