![DL/T5210.3-2009电力建设施工质量验收及评价规程第3部分:汽轮发电机组(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/812/33688812/b_33688812.jpg)
4.7 Water Cooled Condenser Assembly and Erection
4.7.1 Condenser(steam exhaust device)erection.
Applicable scope:applicable to condenser(steam exhaust device)erection,with the following inspection items:condenser(steam exhaust device)shell assembly,condenser(steam exhaust device)in place and alignment.
1 Condenser(steam exhaust device)shell assembly inspection and acceptance are given in Table 4.7.1-1
Table 4.7.1-1 Condenser(steam exhaust device)shell assembly
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_289.jpg?sign=1739132498-LqdMVsDLl0MOZ61JhLxnFE2Z1TqC8VFW-0-97f2e0328f2c2ddf945dcd394004cfb3)
2 Condenser(steam exhaust device)in place and alignment inspection and acceptance are given in Table 4.7.1-2.
Table 4.7.1-2 Condenser(steam exhaust device)in place and alignment
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_290.jpg?sign=1739132498-7to8UZD1fHPsUAQ5zQFSpkKazc9prqLJ-0-55b0e70ee30a3d16872ed79bf09ee2fe)
4.7.2 Condenser cooling tube bundle erection inspection and acceptance are given in Table 4.7.2.
Table 4.7.2 Condenser cooling tube bundle erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_291.jpg?sign=1739132498-sRWfSN7Rxrz4jSttewR9GADELFwFoOyc-0-0391eaf0a2978c658f66532e25a745ef)
Table 4.7.2(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_292.jpg?sign=1739132498-9mLFPxGjyydPAueCXJaoZIBJskO248Zt-0-3345ca8bd6fbb3411f43bc00bd23fe6c)
4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test inspection and acceptance are given in Table 4.7.3.
Table 4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_293.jpg?sign=1739132498-9irmt31EWkpzebm87OZfDna8gzEOtaIY-0-9cc4d90ebf652df772ad3b891a5367bf)
4.7.4 Condenser(steam exhaust device)accessories erection and secondary grouting inspection and acceptance are given in Table 4.7.4.
Table 4.7.4 Condenser(steam exhaust device)accessories erection and Secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_294.jpg?sign=1739132498-3153veXhjCb4DO1liL1CJiOVsRH42edT-0-280b80c816b033a1fc634eaf0ff22845)
4.7.5 Rubber ball cleaner inspection and erection inspection and acceptance are given in Table 4.7.5.
Table 4.7.5 Rubber Ball Cleaner Inspection and Erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_295.jpg?sign=1739132498-ObE75xB5tFFX8ERoXLZ4hU3GQrlh74HG-0-0b8835243ad9fbe211dd4eb440534e48)
4.7.6 Mandatory provision implementation inspection of water cooled condenser assembly erection is given in Table 4.7.6.
Table 4.7.6 Mandatory provision implementation inspection table of water cooled condenser assembly erection subsection project
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_296.jpg?sign=1739132498-SxquWGJbbQPW37MinrsaSXNYWvlY7JCk-0-569c2b4c0e23261f8f6d1482cc96b21a)