5.7 Installation of Frame
Ⅰ Dominant Items
5.7.1 The deformation and peeling of paint on steel element due to handling,piling and hoisting shall be corrected and repaired.
Check quantity:10% random check for elements and at least 4 pieces.
Check method:observe or pull line and check with a steel rule.
Ⅱ General Items
5.7.2 The allowable installation deviation of top rigid frame and frame shall meet the requirements in Table 5.7.2.
Check quantity:full check.
Check method:see Table 5.7.2.
Table 5.7.2 The allowable installation deviation of rigid frame and frame(mm)

Note:H refers to column height.
5.7.3 The allowable installation deviation of supports for top equipment shall meet the requirements in Table 5.7.3.
Check quantity:full check.
Check method:see Table 5.7.3.
Table 5.7.3 Allowable installation deviation of supports for top equipment(mm)